DP2 AHTS with 150tBP for Sale in WA


On offer is a is a 150-tonne bollard pull anchor handling tug supply vessel to the popular Ulstein UT 720 design, built by Ulstein Verft in Norway. Twin Wärtsilä Vasa 12V32D engines give 12,240 BHP through controllable-pitch propellers in nozzles, with Converteam DP2 for precise station keeping.
She was rebuilt in 2018 after special survey and was dry-docked in February 2026, with her OVID inspection updated at the same time. Working in the Gulf of Guinea, she is ready for rig moves, mooring installation, towing, supply duties and standby rescue. The picture is an older one, she was freshly painted during docking earlier this year.
Delivered
February 1998
Rebuilt
October 2018, Alexandria Drydock, after special survey
Class
Bureau Veritas
Flag
Nigeria (Lagos)
Last dry dock
February 2026
OVID
Updated February 2026
Length overall / BP
66.0 m / 59.3 m
Breadth / depth
14.6 m / 7.4 m
Draught
5.2 m design · 6.961 m max.
GT / NT / DWT
1,974 / 716 / 2,100 t
Main engines
2 x Wärtsilä Vasa 12V32D, 12,240 BHP total
Propulsion
2 x Ulstein CP propellers in Kort nozzles
Thrusters
2 x 885 BHP bow, 1 x 885 BHP stern (10 t each)
Generators
2 x 2,250 kVA shaft, 2 x 450 kVA aux., 120 kVA emergency
Bollard pull
148–157 t continuous
AH / towing winch
Ulstein Brattvaag 3-drum, 300 t pull, 430 t brake
Wire capacity
Tow drum 1,500 m, work drums 2 x 1,200 m, all 76 mm
Stern roller
5 x 3 m, 350 t SWL
Stoppers / pins
2 x Karm Fork 440 t · 2 sets Karmøy pins 240 t
Chain lockers
2 x 78 m³, for 84 mm chain
Clear deck
34 x 11.8 m = 401 m², 750 t, 5–10 t/m²
Fuel / water
790 m³ / 457 m³
Liquid mud / brine
245 m³ / 247 m³
Dry bulk
239 m³ in 5 tanks
Consumption
24 t/day at 15 kn · 18 t/day at 12 kn · 14 t/day at 10 kn
Dynamic positioning
Converteam DP2, GPS and CyScan
Fire fighting
Fi-Fi I, 3,000 m³/h, 2 monitors, 120 m throw
Crane
1 x 5 t at 7–11 m
Accommodation
25 berths, hospital, office, mess
Rescue
Norsafe MOB boat, rescue zones P & S
Proven Ulstein UT 720 design: 148–157 t bollard pull from 12,240 BHP Wärtsilä main engines
300 t three-drum Ulstein Brattvaag waterfall winch, 350 t stern roller and 440 t Karm Forks
Converteam DP2 for rig moves, mooring and supply work
Fi-Fi I: 3,000 m³/h with two monitors, 120 m throw
401 m² clear deck for 750 t, plus mud, brine, drill water and 239 m³ dry bulk
Rebuilt 2018 after special survey; dry-docked and OVID updated February 2026
25 berths, standby rescue capability and oil-spill dispersant system

All details without guarantee