top of page
Search
Writer's pictureCapt Thomas

VLCC built in 2015 for sale in UAE


VLCC still available, just received below from our very close Sellers:

+++

We hereby invite your buyers to offer for MT Shanghai. Her itinerary is as follow,

Angra Dos Reis ETA 16-Oct ETD 23-Oct

The delivery point probably range from Fujairah to Japan and time window maybe 10-Dec 2016 to 10-Jan 2017. However, actual delivery shall always subject to the condition of voyage.

Please note that all buyers should offer before 18:00, 14-Oct 2016, Beijing Time. We accept cash only.

Other conditions unchanged.

+++i Builder: Jinhai Heavy Industry Co., Ltd. Blt: 2015 Class DNV-GL Flag:Singapore Double Hull/Double Bottom Deadweight: 320,000 dwt @ scantling draft LOA: 333.00 m LBP: 320.00 m Breadth, moulded: 60.00 m Depth, moulded : 30.50 m Design draft, moulded :20.50 m Scantling draft, moulded :22.50 m Main Engine:6S90ME-C8 (Tier-II) Output: MCR 31,620kW ?á 78 r/min CSR (85%MCR) 26,877kW ?á 73.9 r/min Fuel Consumption: 107.7 ton/day at CSR of main engine Service Speed:Approx. 16.0 knots with the main engine running at CSR (85% MCR) with 15% sea margin at design draft

Cargo tank capacity abt. 352,500 m3 (including slop tanks) Ballast tanks abt 95,000 m3 (Including fore and aft peak tank) Heavy fuel oil tanks abt 9,000 m3 (including one Lower Sulfur H.F.O.T. and settling & service tanks) Diesel oil tank (Including settling and service tank) abt 350m3

Plsd to hear your interest.

Offshore Solutions Unlimited™ Columbia Tower 701 5th Ave #4200 Seattle, WA 98104 Phone: (206)262 7500 Fax: (206)262 8001 www.unlimitedoffshore.com

All particulars are believed to be correct but not guaranteed. All offers are made subject to prior sale, changes in specifications or price and to withdrawal from sales list without notice. Copyright © 2016 Wissmann & Associates LLC, All rights reserved.


133 views0 comments

Recent Posts

See All
bottom of page